The Red Feather Inn | Hotel in Launceston
Hotel in Hadspen, Launceston
Located in Launceston, 5.3 miles from Country Club Casino, The Red Feather Inn has accommodations with a garden, free private parking and a terrace. Located around 7.9 miles from Queen Victoria Museum, the hotel with free WiFi is also 8.7 miles away from Launceston Tramway Museum. Guests can enjoy garden views. All rooms is equipped with air conditioning, a fridge, a toaster, a coffee machine, a shower, free toiletries and a desk. The rooms are equipped with an electric tea pot and a private bathroom with a bath and a hairdryer, while certain rooms also offer a kitchen equipped with a dishwasher. At the hotel each room includes a closet and a flat-screen TV. Symmons Plains Raceway is 20 miles from The Red Feather Inn, while Albert Hall Convention Centre is 8.3 miles from the property. Launceston Airport is 11 miles away.
The Red Feather Inn is located in Launceston.
This 15 Bedrooms Hotel is suitable for tourists and travelers. It has several amenities that would guarantee your comfort. These amenities include: Security/Safety, Sports/Activities, Guest Services, and several others. This is a 4 star rated property and has over 221 reviews with the average score of 9.3 . Coming to Launceston and needing a place to stay? Be it for work or for leisure, consider staying at this Hotel for your next visit, you will surely love it.
You can check the reviews and description of this 15 Bedrooms Hotel if you want to learn more about this place in Launceston. These details are authentic, as they are provided by our partner, booking.com.
This The Red Feather Inn in Launceston is well equipped and has all facilities that have been listed below. Please note that these details were shared to us by booking.com for the listed “The Red Feather Inn”. We solely rely on their shared details and are regarded as “accurate”. If you have any concerns about the information or accuracy describing this Hotel, please let us know.
Amenities
Facility Overview
-
Parking
-
Parking on site
-
Accessible parking
-
Private Parking
-
Free parking
-
Air conditioning
-
Heating
-
Non-smoking rooms
-
Smoke-free property
-
Express check-in/out
-
Daily housekeeping
-
Invoice provided
-
Wifi
-
Internet
-
Free Wifi
-
Picnic area
-
Outdoor furniture
-
Garden
-
Terrace
-
CCTV outside property
-
24-hour security
-
Fire extinguishers
-
Smoke alarms
-
Security alarm
-
Key access
-
CCTV in common areas
-
Linens, towels, and laundry washed in accordance with local authority guidelines
-
Guest accommodation disinfected between stays
-
Guest accommodation sealed after cleaning
-
Use of cleaning chemicals that are effective against coronavirus
-
Guests have the option to cancel any cleaning services for their accommodation during their stay
-
Physical distancing in dining areas
-
All plates, cutlery, glasses, and other tableware sanitized
-
Staff follow all safety protocols as directed by local authorities
-
Hand sanitizer in guest accommodation and common areas
-
First aid kits available
-
Physical distancing rules followed
-
Contactless check-in/out
-
Cashless payment available
Policies
Please note that check in hours are from 16:00 to 17:00. if you expect to arrive outside reception opening hours, please inform the red feather inn in advance, using the special requests box during booking, or by using the contact details found on the booking confirmation, please note that self check in hours for cottages is after 15:00. if you expect to arrive outside reception opening hours, please inform the red feather inn in advance, using the special requests box during booking, or by using the contact details found on the booking confirmation, please note that there is a 3% charge when you pay with an american express credit card, please note that children under 12 years cannot be accommodated at hotel. children under 12 years of age can only be accommodated in our cottages, the restaurant is open for in house guests from thursday to saturday, bookings required 24 hours in advance using the special request box when booking or using the contact details found on the booking confirmation, full refund available if cancelation is covid related.please inform of your expected arrival time in advance. you can use the special requests box when booking, or contact the property directly using the contact details in your confirmation.
Reviews
Room Arrangement
| Room Info | Facilities |
|---|---|
|
Garden Queen Suite
Room Type:
Double
Room Size:
24 m2
|
Food & DrinkTea/Coffee makerBathroomPrivate bathroom, Hairdryer, Free toiletries, Shower, Conditioner, Shampoo, Body soap, Shower cap, Bathrobe, Bathtub, Bathtub or shower, Toilet, Toilet paperMedia & TechnologyTV, Flat-screen TVGeneralTrash cans, Iron, Smoke Alarm, Electric blankets, Private entrance, Heating, Hardwood or parquet floors, Ironing facilities, Key access, Air conditioningKitchenKitchenware, Coffee machine, Refrigerator, Dining table, Electric kettle, Kitchenette, Microwave, ToasterLiving AreaDining area, Sitting area, Sofa, Desk, FireplaceViewGarden view, Inner courtyard view, ViewBedroomWardrobe or closet, LinensRoom amenitiesNon-feather pillowPhysical distancingSingle-room AC for guest accommodationCleanliness & disinfectionHand sanitizer |
|
Library King Suite
Room Type:
Twin/Double
Room Size:
24 m2
|
Food & DrinkTea/Coffee makerBathroomPrivate bathroom, Hairdryer, Free toiletries, Shower, Conditioner, Shampoo, Body soap, Shower cap, Bathrobe, Bathtub, Bathtub or shower, Toilet, Toilet paperMedia & TechnologyTV, Flat-screen TVGeneralTrash cans, Carpeted, Iron, Smoke Alarm, Electric blankets, Heating, Ironing facilities, Key access, Air conditioningKitchenKitchenware, Coffee machine, Refrigerator, Dining table, Electric kettle, Kitchenette, Microwave, ToasterLiving AreaDining area, Sitting area, Sofa, Desk, FireplaceViewGarden view, Quiet street view, ViewBedroomWardrobe or closet, LinensRoom amenitiesNon-feather pillowPhysical distancingSingle-room AC for guest accommodationCleanliness & disinfectionHand sanitizer |
|
Deluxe King Room - Attic
Room Type:
Twin/Double
Room Size:
20 m2
|
Food & DrinkTea/Coffee makerBathroomPrivate bathroom, Hairdryer, Free toiletries, Shower, Conditioner, Shampoo, Body soap, Shower cap, Bathrobe, Bathtub, Bathtub or shower, Toilet, Toilet paperMedia & TechnologyTV, Flat-screen TVGeneralTrash cans, Iron, Smoke Alarm, Electric blankets, Heating, Hardwood or parquet floors, Ironing facilities, Key access, Air conditioningKitchenDining table, Coffee machine, Refrigerator, Electric kettle, ToasterLiving AreaDesk, Dining area, Sitting area, FireplaceViewGarden view, ViewBedroomWardrobe or closet, LinensRoom amenitiesNon-feather pillowPhysical distancingSingle-room AC for guest accommodationCleanliness & disinfectionHand sanitizer |
|
Deluxe Queen Room - Loft
Room Type:
Double
Room Size:
20 m2
|
Food & DrinkTea/Coffee makerBathroomPrivate bathroom, Hairdryer, Free toiletries, Shower, Conditioner, Shampoo, Body soap, Shower cap, Bathrobe, Bathtub, Bathtub or shower, Toilet, Toilet paperMedia & TechnologyTV, Flat-screen TVGeneralTrash cans, Iron, Smoke Alarm, Electric blankets, Heating, Ironing facilities, Key access, Air conditioningKitchenDining table, Coffee machine, Refrigerator, Electric kettle, ToasterLiving AreaDesk, Dining area, Sitting area, FireplaceViewGarden view, Inner courtyard view, ViewBedroomWardrobe or closet, LinensRoom amenitiesNon-feather pillowPhysical distancingSingle-room AC for guest accommodationCleanliness & disinfectionHand sanitizer |
|
Red Feather Deluxe Queen Room
Room Type:
Double
Room Size:
20 m2
|
Food & DrinkTea/Coffee makerBathroomPrivate bathroom, Hairdryer, Free toiletries, Shower, Conditioner, Shampoo, Body soap, Shower cap, Bathrobe, Bathtub, Bathtub or shower, Toilet, Toilet paperMedia & TechnologyTV, Flat-screen TVGeneralTrash cans, Carpeted, Iron, Smoke Alarm, Electric blankets, Heating, Ironing facilities, Key access, Air conditioningKitchenDining table, Coffee machine, Refrigerator, Electric kettle, ToasterLiving AreaDesk, Dining area, Sitting area, FireplaceViewGarden view, Quiet street view, ViewBedroomWardrobe or closet, LinensRoom amenitiesNon-feather pillowPhysical distancingSingle-room AC for guest accommodationCleanliness & disinfectionHand sanitizer |
|
Murphetts 5 Bedroom Cottage
Room Type:
Villa
Room Size:
200 m2
|
Food & DrinkTea/Coffee makerBathroomPrivate bathroom, Hairdryer, Free toiletries, Shower, Conditioner, Shampoo, Body soap, Additional bathroom, Bathtub or shower, Bathtub, Shower cap, Toilet, Toilet paperMedia & TechnologyTV, Flat-screen TVGeneralTrash cans, Carpeted, Iron, Smoke Alarm, Electric blankets, Private entrance, Heating, Hardwood or parquet floors, Ironing facilities, Key access, Fire extinguisher, Air conditioningKitchenCleaning products, Kitchen, Oven, Kitchenware, Coffee machine, Refrigerator, Dining table, Washing machine, Electric kettle, Dishwasher, Stovetop, Microwave, Dryer, ToasterLiving AreaDining area, Sitting area, Sofa, Desk, FireplaceOutdoorsOutdoor dining area, Outdoor furniture, Patio, TerraceViewGarden view, Inner courtyard view, ViewBedroomWardrobe or closet, LinensRoom amenitiesNon-feather pillowPhysical distancingSingle-room AC for guest accommodationCleanliness & disinfectionHand sanitizer |
|
Watchouse 4 Bedroom Cottages
Room Type:
Villa
Room Size:
200 m2
|
Food & DrinkTea/Coffee makerBathroomPrivate bathroom, Hairdryer, Free toiletries, Shower, Conditioner, Shampoo, Body soap, Additional bathroom, Bathtub or shower, Bathtub, Shower cap, Toilet, Toilet paperMedia & TechnologyTV, Flat-screen TVGeneralTrash cans, Carpeted, Iron, Smoke Alarm, Electric blankets, Private entrance, Heating, Hardwood or parquet floors, Ironing facilities, Key access, Fire extinguisher, Air conditioningKitchenCleaning products, Kitchen, Oven, Kitchenware, Coffee machine, Refrigerator, Dining table, Electric kettle, Dishwasher, Stovetop, Microwave, Dryer, ToasterLiving AreaDining area, Sitting area, Sofa, Desk, FireplaceOutdoorsOutdoor dining area, Outdoor furniture, Patio, TerraceViewGarden view, Inner courtyard view, Quiet street view, ViewBedroomWardrobe or closet, LinensRoom amenitiesNon-feather pillowPhysical distancingSingle-room AC for guest accommodationCleanliness & disinfectionHand sanitizer |
|
Three-Bedroom Villa
Room Type:
Villa
Room Size:
200 m2
|
Food & DrinkTea/Coffee makerBathroomPrivate bathroom, Hairdryer, Free toiletries, Shower, Conditioner, Shampoo, Body soap, Additional bathroom, Bathtub or shower, Bathtub, Shower cap, Toilet, Toilet paperMedia & TechnologyTV, Flat-screen TVGeneralTrash cans, Carpeted, Iron, Smoke Alarm, Electric blankets, Private entrance, Heating, Hardwood or parquet floors, Ironing facilities, Key access, Fire extinguisher, Air conditioningKitchenCleaning products, Kitchen, Oven, Kitchenware, Coffee machine, Refrigerator, Dining table, Washing machine, Electric kettle, Dishwasher, Stovetop, Microwave, Dryer, ToasterLiving AreaDining area, Sitting area, Sofa, Desk, FireplaceOutdoorsOutdoor dining area, Outdoor furniture, Patio, TerraceViewGarden view, Inner courtyard view, Quiet street view, ViewBedroomWardrobe or closet, LinensRoom amenitiesNon-feather pillowPhysical distancingSingle-room AC for guest accommodationCleanliness & disinfectionHand sanitizer |
FAQ's
Is this property pet-friendly for guests?
No, pets are not allowed at this property. Check the guest reviews to learn what guests had to share.
What time is check-in & check-out at property?
Check-in time for The Red Feather Inn starts counting from 2:00 PM and check-out is until 10:00 AM. However, early check-in or late check-out can sometimes be negotiated between the guest and the owner or the manager of this property.
Does the property have a swimming pool?
No, this The Red Feather Inn does not have a swimming pool. Check the Facility Overview section for details about the pool and other available facilities.
How much does it cost per night to stay in property?
Best-rates for the The Red Feather Inn starts from $170 per night with includes View, Balcony/Terrace, Accessibility, Internet, Parking, Security/Safety, Sports/Activities, Guest Services, Air Conditioner with all other facilities. matches every traveler with their perfect accommodation, whether you are traveling with a group, friends, family, or pets.
Is property a family-friendly place to stay?
Based on the information we have received from the owner or our partner, this is not considered to be a family-friendly property. As reported by the owner or manager, the hotel has not specified that children are welcome. Please see details about suitability for your family or inquire with the property to learn more.
Is the property wheelchair accessible or offer services for disabled guests?
Based on the information received from our partner, the The Red Feather Inn has not specified they are wheelchair accessible. Likewise, there is not an elevator specified as being available at the property. Specific accessibility details may be addressed in the property details section of this page.
What is the minimum night stay policy for the property?
Based on the information reported by the owner or manager, the The Red Feather Inn indicates 1 day stay policy at this hotel. Guests are cautioned that the minimum stay policy may differ based on seasonality or availability and may be at the discretion of the owner or manager.
What cancellation policy is in place for property?
Guests are cautioned that the cancellation policy may differ based on seasonality, availability, or current travel restrictions. Guests should also be aware that this policy may be subject to change and should be confirmed prior to booking. More details may be available on this page in the property description. However, early check-in or late check-out can sometimes be negotiated between the guest and the owner or the manager of this property.